Steamship expects Gay Head service on Thursday - The Martha's Veyard Tim

mv gay head ferry

Vsel GAY-HEAD (IMO: 8123418, MMSI: 367327120) is a Passenger/Ro-Ro Cargo Ship built 1981 and currently sailg unr the flag of Uned Stat (USA).

Contents:

STEAMSHIP EXPECTS GAY HEAD SERVICE ON THURSDAY

The Gay Head is expected to rume service on Thursday Aug 4.

The Steamship Authory expects the eight ferry Gay Head to return to service on Thursday after repairs Connecticut. In a Tuday statement, Drisll wrote, “Repairs are unr way on the MV Gay Head at Tham Shipyard New London, Conn.

GAY HEAD

The MV Gay Head will rume service on the Nantucket route Thursday, startg wh s schled 5:30 am parture om Hyannis. The repair of the Gay Head took some effort, Drisll told The Tim.

GAY-HEAD

Another SSA eight ferry, the Katama, was drydock at Tham Shipyard for schled work when the Gay Head was sent there for emergency repairs.

THROTTLE ISSUE SILED EIGHT FERRY GAY HEAD

The Katama had to be refloated and moved out of the way so the Gay Head uld e the dry dock, Drisll said.

The MV Sankaty will be helpg to fill a gap ed by an emergency repair to the MV Gay Head. A problem wh the MV Gay Head is forcg the Steamship Authory to play mil ferri jt ahead of a by summer weekend. “Followg the disvery of a small amount of water the steerg gear void of the MV Gay Head, a survey of the vsel’s hull disvered a 4-ch crack the hull on the vsel’s aft, ” Sean Drisll, a spokman for the SSA, wrote an email.

While the Gay Head servic the Hyannis to Nantucket crossg, s absence will have an impact on the Veyard route, as well. The MV Sankaty will service the MV Gay Head’s trips on the Nantucket route on Saturday and Sunday. Sunday eveng, the MV Sankaty will make the MV Gay Head’s last schled parture om Nantucket at 6:45 p.

*BEAR-MAGAZINE.COM* MV GAY HEAD FERRY

GAY-HEAD, Passenger/Ro-Ro Cargo Ship - Details and current posn - IMO 8123418 - VselFr .

TOP